Friction welding trial production and evaluation
- Top
- Business information
- Machine tool business
- Support
- Friction welding trial production and evaluation
Prototype and Sample Production
Izumi offers trial production and evaluation, as well as samples to allow customers to gather data on research and development, manufacturing process improvements, and mass-production studies, as well as to help make decisions on machine adoption. In response to complex issues such as handling unknown special materials or requests for high quality, we are able to deal with a wide range of requirements using our extensive range of small to large test machines.
Trial Production and Evaluation Flow
-
Step 1
Trial production inquiry
-
Step 2
Decision on whether to carry out trial production
-
Step 3
Study of trial production schedule
-
Step 4
Estimate submission
-
Step 5
Trial production evaluation
-
Step 6
Report creation
-
Step 7
Completion → equipment proposal
Friction Welding Test Machines
In response to requests for pressure welding of special materials, or for higher joint quality, Izumi can produce prototypes and samples using our extensive range of small to large test machines, as well as with a wealth of data backed up by our experience. Furthermore, we are improving friction welding machine reliability through extensive research such as applying electronics and evaluating new technologies.
List of equipment capabilities
Model | Minimum workpiece diameter (φmm) |
Maximum workpiece diameter (φmm) |
Maximum workpiece length at chuck side (mm) |
Maximum workpiece length at clamp side (mm) |
FW3mini | 1.5 | 3 | 15 | 15 |
FW3NC | 3 | 6 | 40 | 50 |
FW005VS-I-C | 4 | 8 | 25 | 40 |
FW15NC | 8 | 15 | 200 | 200 |
FW030VT-IMU-C | 15 | 25 | 30 | 30 |
FW30NC | 15 | 35 | 250 | 250 |
FW30VT | 15 | 35 | 110 | 50 |
FW45NC | 15 | 35 | 300 | 1500 |
FW45HS-XT | 15 | 35 | 330 | 1300 |
FW60X | 25 | 70 | 400 | 1000 |
FW120HT | 45 | 150 | 150 | 1500 |
Cost study
Izumi offers cost reduction proposals such as streamlining of welding processes and overhauling of manufacturing processes.